Ningbo Bosite Polymer Material Technology Co., Ltd. Thermoplastic Elastomer Production Project Environmental Impact Report Form Public Participation Explanation

2020-03-25

Ningbo Bosite Polymer Material Technology Co., Ltd. Thermoplastic Elastomer Production Project Environmental Impact Report Form Public Participation Explanation

Ningbo Bosite Polymer Materials Technology Co., Ltd. June 2019

catalogue

1 Overview 1

1.1 Project Origin 1

1.2 Overview 1

2. Information Disclosure of the First Environmental Impact Assessment 2

2.1 Public Content and Date 2

2.2 Disclosure Method 3

2.3 Public Opinion Situation 3

3. Publicity of Draft for Soliciting Opinions 4

3.1 Timely limit of public announcement content 4

3.2 Publicity Method 4

3.3 Review situation 5

3.4 Public Opinions 5

4 Other public participation explanations 6

4.1 Public symposiums, hearings, expert argumentation meetings, etc. 6

4.2 Other Public Participation 6

4.3 Promotion of Science Popularization 6

5. Handling of Public Opinions 7

5.1 Overview and Analysis of Public Opinion 7

5.2 Acceptance of Public Opinion 7

5.3 Failure to adopt public opinions 7

6. Disclosure before approval 8

6.1 Public Content and Date 8

6.2 Disclosure Method 8

7 Other 9

8 Integrity Commitment 10

9 Attachment 11

9.1 First screenshot of network publicity 11

9.2 Publicity of Draft for Soliciting Opinions 12

9.3 Screenshot of the online publication of the draft for soliciting opinions 13

9.4 Screenshot of soliciting opinions for publication in the newspaper 14

9.5 Screenshot of Posting and Publicizing the Draft for Soliciting Opinions 16

1 Overview

1.1 Project Origin

Ningbo Bosite Polymer Material Technology Co., Ltd. was registered and established on February 23, 2017, specializing in the manufacturing of thermoplastic elastomers. It was originally located at No. 259 Danyang Road, Danxi Street, Xiangshan County. In March 2017, the enterprise entrusted Zhejiang Renxin Environmental Science Institute Co., Ltd. to prepare the "Environmental Impact Report Form for Ningbo Bosite Polymer Material Technology Co., Ltd. Plastic Product Production Project" and obtained approval from the Xiangshan County Environmental Protection Bureau, The approval number is Zhexiang Huanxu [2017] No. 020. Due to the development needs of the enterprise, it is now relocated to the west side of Haifa Road in Binhai Industrial Park, Xiangshan County. The original factory area has ceased production, and the equipment has been relocated. After the relocation, its equipment, annual output, and process flow will not change.

According to the General Guidelines for Environmental Impact Assessment of Construction Projects (HJ2.1-2016), in the environmental impact assessment work procedure, public participation and the preparation of environmental impact assessment documents are separated. The main responsibility for public participation is the construction unit, which is responsible for implementing public participation and the preparation of public participation reports, The environmental impact assessment report and public participation report of the construction project shall be jointly submitted by the construction unit to the environmental supervision unit. On April 16, 2018, the ministerial meeting of the Ministry of Ecology and Environment reviewed and approved the "Measures for Public Participation in Environmental Impact Assessment", which was announced on July 16, 2018 and implemented from January 1, 2019. The new environmental impact assessment public participation method has new regulations for public participation. On October 12, 2018, the Ministry of Ecology and Environment released two supporting documents, the "Public Opinion Form for Environmental Impact Assessment of Construction Projects" and the "Format Requirements for Public Participation Explanation of Environmental Impact Assessment of Construction Projects", which were implemented together with the Measures.

To this end, our unit conducted relevant public participation work during the commissioning of environmental impact assessment work in accordance with relevant regulations, and prepared a public participation statement for environmental impact assessment of this project in accordance with the Ministry of Ecology and Environment's "Measures for Public Participation in Environmental Impact Assessment", "Public Opinion Form for Environmental Impact Assessment of Construction Projects", and "Format Requirements for Public Participation Statement for Environmental Impact Assessment of Construction Projects", To understand the level of public understanding, support, and attention to the project in the project location, safeguard the vital interests of the public, and provide reference for scientific decision-making by management departments.

1.2 Overview

This project is located on the west side of Haifa Road in Binhai Industrial Park, Xiangshan County, covering an area of approximately 9788.2 square meters. The east side of the project is Haifa Road, and across the road is Ningbo Junyin Enterprise; To the south is Xiangshan Tianshuo Technology Electronics Co., Ltd; To the west is Ningbo Shengqian Food Machinery Co., Ltd; To the north is Jinyang Road, with its geographical location shown in Figure 1.2-1. The nearest sensitive point of the project is Jinjingtou Village, which is about 870 meters away from the factory boundary on the northwest side. The total investment of this project is about 20 million yuan. After the project is completed, it mainly produces thermoplastic elastomers (TPE, TPR, TPV), with an annual output of 6000 tons and an annual output value of 10 million yuan.

Figure 1.2-1 Remote Sensing Map of the Geographical Location of the Project

2. Information Disclosure of the First Environmental Impact Assessment

2.1 Public Content and Date

The first disclosure of environmental impact assessment information for this project mainly includes: project name and engineering summary; Overview of the construction unit; Overview of environmental impact assessment institutions responsible for assessment work; The working procedures and main work contents of environmental impact assessment; The main matters of public participation; The main way for the public to express their opinions. The content of the first environmental impact assessment information disclosure complies with the relevant provisions of Article 9 of the Measures for Public Participation in Environmental Impact Assessment. The content of the first environmental impact assessment information disclosure is detailed in Section 8.1.

Ningbo Bosite Polymer Materials Technology Co., Ltd. officially commissioned Zhejiang Renxin Environmental Science and Technology Institute Co., Ltd. to carry out environmental impact assessment work in April 2019. Ningbo Bosite Polymer Materials Technology Co., Ltd. conducted its first environmental impact assessment public announcement from May 6, 2019 to May 17, 2019 (a total of 10 working days) (see Section 9.1 for details), The first public announcement date of environmental impact assessment complies with the relevant requirements of Article 9 of the Measures for Public Participation in Environmental Impact Assessment.

2.2 Disclosure method

2.2.1 Network

The first public disclosure of environmental impact assessment information for this project has been made online, with the public address located on the Bosite New Materials website (construction unit). The selection of online publicity carriers complies with the requirements of Article 9 of the Measures for Public Participation in Environmental Impact Assessment regarding the selection of online publicity platforms.

Website of the construction unit: http://o1382y.cn

Please refer to Section 9.1 for the online publication time and screenshot of the first environmental impact assessment information disclosure.

2.2.2 Others

The first public announcement did not adopt other public methods.

2.3 Public Opinion Situation

During the first environmental impact assessment information disclosure period, the contact persons left on the disclosure content did not receive any feedback or doubts from relevant units and individuals.

3. Publicity of Draft for Soliciting Opinions

3.1 Publicity Content and Time Limit

The main content of the draft for soliciting opinions on the environmental impact assessment of this project is: the online link to the full text of the draft for soliciting opinions on the environmental impact report form and the ways and means of accessing the paper report; The public scope for soliciting opinions; Network link to public opinion form; The ways and means for the public to provide opinions; The starting and ending times for public opinions, etc. The content of the draft for soliciting opinions complies with the relevant provisions of Article 10 of the Measures for Public Participation in Environmental Impact Assessment. The content of the draft for soliciting opinions on environmental impact assessment is detailed in Section 9.3.

After the solicitation of opinions on the environmental impact report form for the thermoplastic elastomer production project of Ningbo Bosite Polymer Material Technology Co., Ltd., Ningbo Bosite Polymer Material Technology Co., Ltd. conducted the second environmental impact assessment public announcement from May 31, 2019 to June 13, 2019 (a total of 10 working days) (see Section 9.3 for details), The date and deadline for the second environmental impact assessment public announcement comply with the relevant requirements of the "Measures for Public Participation in Environmental Impact Assessment".

3.2 Publicity methods

3.2.1 Network

The public address of the draft for soliciting opinions on the environmental impact assessment of this project (second public announcement) is located on the Bosite New Materials website (construction unit), and the online public announcement period is from May 31, 2019 to June 13, 2019 (a total of 10 working days). The selection of online publicity carriers shall comply with the relevant requirements of Article 9 of the "Measures for Public Participation in Environmental Impact Assessment", which states that "it shall be publicly available through online platforms and the continuous public disclosure period shall not be less than 10 working days".

Bosite New Materials Website:

http://o1382y.cn

Please refer to Section 8.5 for the information disclosure time and screenshot of the environmental impact assessment draft for this project.

3.2.2 Newspapers

The second environmental impact assessment information disclosure was conducted on June 3, 2019 and June 5, 2019 in Section 9.4.

The selected carrier for publication in the newspaper (Xiangshan Daily) complies with the relevant provisions of Article 11 of the "Measures for Public Participation in Environmental Impact Assessment", which states that "the information shall be made public through newspapers that are easily accessible to the public in the location of the construction project, and the information shall not be disclosed less than twice within 10 working days of soliciting opinions".

3.2.3 Posting

The second public announcement of this project will be held at the village committees of Jinjingtou Village, Nanpan Village, and Songao Village. The public announcement will take place from January 31, 2019 to February 19, 2019 (a total of 10 working days). The time and screenshot of the second environmental impact assessment information disclosure are detailed in Section 9.5.

The selected posting area for public announcement shall comply with the relevant provisions of Article 11 of the Environmental Impact Assessment Public Participation Measures, which states that "the announcement shall be made public by posting it in a place where the construction project is located that is easily accessible to the public, and the continuous disclosure period shall not be less than 10 working days".

3.2.4 Others

The second publicity of this project only used three methods of publicity: online, newspaper, and post, without any other publicity methods.

3.3 Review situation

The electronic version of the Environmental Impact Report can be found at http://o1382y.cn The site for reviewing the paper environmental impact report is located on the west side of Haifa Road in Binhai Industrial Park, Xiangshan County. The contact number is 13771710123. During the second public announcement, no relevant personnel or units visited the site for reviewing the paper environmental impact report.

3.4 Public opinions

During the second environmental impact assessment information disclosure period, the contact persons left on the disclosure content did not receive feedback or doubts from relevant units and individuals; The unit and management department where the announcement is located have not received any feedback or doubts from relevant units and individuals.

4. Other public participation explanations

4.1 Public symposiums, hearings, expert argumentation meetings, etc

The construction unit has not conducted in-depth public participation activities such as public symposiums, hearings, and expert argumentation meetings, and there is no relevant explanation.

4.2 Other public participation situations

The construction unit has not requested the local people's government to strengthen coordination and guidance, and there is no relevant explanation.

4.3 Promotion of Science Popularization

The construction unit has not taken measures to promote science popularization, and there is no relevant explanation.

5. Handling of Public Opinions

5.1 Overview and analysis of public opinions

During the two environmental impact assessment information publicity periods, the contact persons left on the publicity content did not receive feedback or doubts from relevant units and individuals; The unit and management department where the announcement is located have not received any feedback or doubts from relevant units and individuals.

5.2 Acceptance of public opinions

Due to the fact that during the two environmental impact assessment information publicity periods, the contact persons, construction units, and management departments left on the publicity content did not receive feedback or doubts from relevant units and individuals, there are no public opinions to be adopted in this environmental impact assessment.

5.3 Failure to adopt public opinions

Due to the fact that during the two environmental impact assessment information publicity periods, the contact persons, construction units, and management departments left on the publicity content did not receive feedback and doubts from relevant units and individuals, there were no public opinions to be adopted in this environmental impact assessment. Therefore, there were no opinions that were not adopted in this public participation activity.

6. Disclosure before approval

6.1 Public Content and Date

According to the requirements of the "Measures for Public Participation in Environmental Impact Assessment", the construction unit shall publicly disclose the full text of the environmental impact report to be submitted for approval and the explanation of public participation through the online platform before submitting it to the ecological environment regulatory department for approval. Therefore, on June 19, 2019, our company posted on its website( http://o1382y.cn )Publish the full text of the environmental impact report form and public participation explanation.

6.2 Disclosure methods

6.2.1 Network

1. Network platform: Our company's website

2. Publicity date: June 19, 2019

3. Publicity website: http://o1382y.cn

4. Public screenshot: see section 9.6 for details

6.2.2 Others

This project has not been disclosed through other means.

7 Others

Our unit has carried out public participation work for the "Ningbo Bosite Polymer Material Technology Co., Ltd. Thermoplastic Elastomer Production Project" in accordance with the relevant requirements of the "Environmental Impact Assessment Public Participation Measures". We have fully absorbed the opinions of relevant units, experts, and individuals in the environmental impact report form, and have archived relevant information on public participation for future reference.

8 Integrity Commitment

Commitment Letter for Public Participation in Environmental Impact Assessment

Our unit has carried out public participation work in the preparation stage of the environmental impact report form for the thermoplastic elastomer production project of Ningbo Bosite Polymer Materials Technology Co., Ltd. in accordance with the requirements of the "Public Participation Measures for Environmental Impact Assessment", and has prepared a public participation statement in accordance with the requirements.

Our unit promises that the content of the "Public Participation Statement for Environmental Impact Assessment of Thermoplastic Elastomer Production Project of Ningbo Bosite Polymer Material Technology Co., Ltd." submitted this time is objective and true, and does not include state secrets, trade secrets, or personal privacy that are not allowed to be disclosed according to law. Ningbo Bosite Polymer Materials Technology Co., Ltd. shall be fully responsible for any fraud, concealment, or any consequences arising therefrom.

Commitment unit: Ningbo Bosite Polymer Material Technology Co., Ltd

Commitment date: June 19, 2019

9 Attachments

9.1 Screenshot of First Network Publicity

Publicly displayed on the Boster New Materials website (construction unit)

 

9.2 Publicity of Draft for Soliciting Opinions

9.3 Screenshot of the online publication of the draft for soliciting opinions

Publicly displayed on the Boster New Materials website (construction unit)

9.4 Screenshot of soliciting opinions for publication in the newspaper

Published in Xiangshan Daily on June 3, 2019

 

2019年6月5刊登于象山日報

 

9.5 Screenshot of Posting and Publicizing the Draft for Soliciting Opinions

Tel:+86-574-65723077
Fax:+86-574-65721600
Mobile:+86-13771710123 +86-13586809688
E-mail: shiyixiong@bosite-tpe.com
Website:o1382y.cn/www.tpstpv.com
Address: No. 47 Haifa Road, Binhai Industrial Park, Xiangshan County, Ningbo City, Zhejiang Province